Pool builders in
Burleigh Heads.
We have built 12 pools in Burleigh Heads since 2009, most of them a few minutes from our studio on Tallebudgera Creek Road. Sand, salt air and tight beachside blocks shape every one. This page sets out what building here involves, what it costs and which pools suit the suburb.
N°01 · A recent Burleigh Heads project
Plate 01 · Burleigh Headland

Project N°09 · Concrete pool · 2025
Burleigh Headland
A 1960s brick house on the northern slope of the headland, rebuilt by its owners as a long, low family home. The brief was a pool for laps before work and for grandchildren at the weekend, set close enough to the house to read as part of it.
The block sits on sand over weathered rock, with the water table about a metre and a half down at the low corner. We pumped the excavation during the dig, founded the shell on bored piers to rock and craned the steel in over the roof from the street. Honed travertine coping was chosen for salt air and bare feet.
Pool
11.5 by 3.6 m, concrete
Depth
1.1 to 1.6 m
Coping
Honed travertine
Build time
16 weeks · 2025
N°02 · Building here
City of Gold Coast · QLD 4220
Building a pool in Burleigh Heads.
Burleigh Heads is a rewarding place to build a pool, and a technical one. Most blocks sit on beach sand, some on the rock of the headland, and nearly all of them catch salt on the north-easterly. Each of those changes how we dig, what we found the shell on and which stone goes around it.
01 · Ground and exposure
Sand, salt and the headland
East of the Gold Coast Highway, most of Burleigh Heads is built on deep, clean beach sand. It digs quickly but will not hold a vertical face, so we batter the excavation back or shore it, and the engineer usually specifies a thicker floor and more steel than the same pool would need on clay.
Near the beach and along Tallebudgera Creek, the water table can sit a metre or two below the lawn, and it rises after heavy rain and on king tides. We check for it at the site visit, pump the excavation during the dig and fit a hydrostatic relief valve so an empty shell cannot lift.
On the headland streets the ground reverses. Weathered rock can appear within a metre of the surface and has to be broken out with a hammer, which we price after a test dig rather than guess.
Wherever you are in the suburb, the salt air decides the materials. We use dense stone such as travertine, granite or bluestone for coping, 316 marine-grade stainless steel for every fixing, and house the equipment out of the weather.
02 · Approvals
Council and approvals
Burleigh Heads sits within the City of Gold Coast. A pool on a house block normally needs building approval rather than a development application, and we lodge it through a private certifier once the engineering is done. Council becomes involved where an overlay applies: the coastal erosion and storm tide areas near the beach, the flood overlay along Tallebudgera Creek, and the setback and height rules in the local plan.
Sewer and stormwater mains often run along the back boundary of the older blocks, and building over or close to them needs a separate approval, so we locate them before the design is fixed. Every pool also needs a compliant barrier and registration on the Queensland pool safety register. A new pool is insurable residential work, so every Queensland build we do carries QBCC Home Warranty Insurance under licence 0000000.
03 · Access
Access on tight beachside blocks
Many Burleigh Heads homes sit on narrow lots with a garage across the front and a metre of side path, and newer townhouses leave even less. When a small excavator cannot reach the back, we crane it in with the steel and often the coping, usually over the house in a single morning under a traffic management plan.
Some streets near the beach have rear laneways, which make for a cleaner build: spoil goes out the back, deliveries come in the back and the front garden stays intact. Shotcrete is pumped through a line up to 60 metres long, so the truck stays on the street. We plan the access route, the crane day and the letters to neighbours before we start, and protect paths and lawns for the length of the build.
04 · Timeline
How long a pool takes here
From the first site visit to handover, most pools here take about 20 weeks, in line with our six stages: two weeks for the consult and survey, four for design and 3D, four for approvals and engineering, then about ten on site. An overlay can add a few weeks to approvals. In sand the dig is quick, though dewatering, or rock on the headland, can each add a week.
We take on twelve pools a year across three regions, so a director is on your site every week of the build. From our Burleigh Heads studio, that is rarely more than a ten-minute drive.
Our process in detailBook a design consultation
Start with a site visit.
A director visits, measures the site and talks through ideas and budget. No cost, no obligation.
Reply within one business day · 07 5576 3480

Plate 02 · Excavation in sand, shored and pumped
Built from Burleigh Heads
Studio
Tallebudgera Creek Road
Google rating
4.9 from 126 reviews
QBCC licence
0000000
Shell warranty
Lifetime, structural
N°03 · Pools that suit Burleigh Heads
Four of seven types
Pools that suit
Burleigh Heads homes.
Block size, sand and salt narrow the field here. These are the four pool types we build most often in the suburb, and why each one suits.
All pool typesN°03
Plunge pools
From $65K
Fits the courtyards and side setbacks of narrow lots, and keeps the dig shallow where the water table is high.
N°01
Concrete pools
From $95K
The family pool for full-size blocks behind the dunes, with a thicker floor and more steel for sand.
N°04
Lap pools
From $90K
Runs down the side of a narrow lot and leaves the garden its width. Usually 12 to 25 metres long.
N°02
Infinity edge pools
From $160K
For the headland and the rise behind it, where an edge can carry the eye out to the point and the sea.
N°04 · Reviews from Burleigh Heads
4.9 from 126 Google reviews
Clients in and around
Burleigh Heads.
Reviews from clients within a few kilometres of the suburb. Every review is published on Google, including the four-star ones.
Read all 126 reviews5.0 · Google review
“They found the rock under our lawn at the site visit, priced it before we signed and still finished a week early.”
Daniel and Kate M.
Burleigh Heads · Concrete pool · 2025
5.0 · Google review
“Our laneway is barely three metres wide. They craned everything in over the garage in a single morning.”
Rosa T.
Burleigh Heads · Plunge pool · 2024
5.0 · Google review
“A director was on site every week. Two summers on, the travertine looks the way it did the day it was laid, salt and all.”
Ben and Alice H.
Mermaid Beach · Lap pool · 2023
N°05 · Recent pools nearby
Within 15 km of the studio
Recent pools, close to home.
Three recent builds a short drive from Burleigh Heads, from beachfront sand at Mermaid Beach to the valleys behind the coast.
All projectsN°06 · Nearby areas
Gold Coast · Distance from the studio
Also building nearby.
Burleigh Heads is home, but our crews work right across the Gold Coast. Each suburb page covers its own ground, access and recent projects.
All Gold Coast areasN°07 · Local questions
Burleigh Heads,
answered.
Questions we hear from Burleigh Heads owners at the first site visit. For anything else, call the studio on 07 5576 3480.
All questionsHow much does a pool cost in Burleigh Heads?
Most pools we build here land between $95,000 and $160,000, including coping, interior, equipment and certification. A plunge pool starts from $65,000 and an infinity edge on the headland from $160,000. Shoring, dewatering, rock and crane days are the local variables, and all of them are priced in the fixed quote before anything is dug.
Can you build a pool on sand this close to the beach?
Yes. Most of the suburb is sand, and it is good ground to build on when it is engineered for. The engineer sizes the floor and steel from the soil test, we shore or batter the excavation, and where the water table is high we pump during the dig and fit a hydrostatic valve so the empty shell cannot lift.
Do I need council approval for a pool in Burleigh Heads?
Usually you need building approval from a private certifier, which we arrange, rather than a council application. The City of Gold Coast becomes involved if a coastal, flood or heritage overlay applies, or if the pool sits near a sewer main. Every pool also needs a compliant fence and registration on the Queensland pool safety register.
Our block has no side access. Can you still build?
Usually, yes. We lift the excavator, steel and coping in by crane, often over the house in a single morning, and pump the shotcrete from the street through a line up to 60 metres long. The crane day is planned with a traffic management plan and a letter to the neighbours.
Which coping stone lasts in the salt air?
Dense, low-porosity stone: travertine, granite and bluestone all weather well here once sealed. We avoid soft sandstones within a few streets of the beach, use 316 marine-grade stainless steel for every fixing and keep the equipment covered. Our Journal guide to travertine, limestone and bluestone compares them in detail.


