Real numbers from forty of our recent builds across the Gold Coast, Brisbane and the Northern Rivers: what a pool costs by type, what the price includes, and the five decisions that move it most.

Words by James Whitcombe, Design director

Reviewed by Tom Hollis, QBCC licensed builder

Updated Sep 18, 2026

All notes

Fig. 01 · Pool, deck and pavilion planned as one room, then priced as one contract

Photographed June 2025

Written by

James designs and prices every Retreat pool at concept stage, alongside clients’ architects and landscape designers. He keeps the cost ledger behind this guide and updates it each September.

Reviewed by Tom Hollis · QBCC licence 0000000

Meet the studio

01 · The short answer

Most custom concrete pools we build in 2026 cost between $95,000 and $180,000, fully installed with coping, interior, equipment, fencing and certification. Plunge pools start from $65,000 and infinity edges from $160,000, and the final figure depends most on access, ground conditions and finishes.

Pool prices online tend to fall into two camps. Some are starting prices for a bare shell with nothing around it. Others are averages that mix fibreglass, concrete and renovations into one unhelpful number. Neither tells you what you will actually sign for.

This guide uses our own ledger instead: forty custom concrete pools completed between 2023 and 2026, each priced at concept stage and reconciled at handover. The figures are what clients paid, including GST, for a finished and certified pool they could swim in.

02 · Price ranges

Price ranges by pool type

The table shows the range most of our pools fall into for each type. The lower figure is a simple shape on a flat block with good access. The upper figure is a larger pool with natural stone, a fully tiled interior and some site work. Very few pools land outside these ranges, and when one does, it is usually because of the site rather than the pool.

Pool type

Typical size

Typical price

Build time

Plunge pool

4 to 6 m

$65K to $95K

10 to 14 weeks

Lap pool

15 to 25 m

$90K to $160K

14 to 18 weeks

Concrete pool

8 to 12 m

$95K to $180K

14 to 18 weeks

Infinity edge pool

9 to 15 m

$160K to $320K

18 to 24 weeks

Spa

2.4 to 3 m

$45K to $75K

8 to 12 weeks

Renovation

Existing pool

$35K to $90K

6 to 10 weeks

Prices include GST, design, engineering, approvals, a glass pool fence allowance and certification. A spa built with a new pool usually adds $30K to $55K to the pool price.

Two things stand out in the ledger. Size matters less than most people expect: going from an 8 metre pool to a 10 metre pool on the same site adds roughly 8 to 12 per cent, because design, engineering, access and equipment cost the same either way. And the gap between the lower and upper figures is almost entirely finishes and site. Those are the decisions worth your time.

03 · Inclusions

What the price includes

A fixed price from us is for a finished pool, not a shell. It covers every trade from the first survey to the day we hand over the keys to the equipment room. Allowances are written into the contract with quantities, so you can see exactly what has been assumed.

Included in every fixed price

01

Site survey, design, 3D model and structural engineering

02

Approval through a private certifier, and the QBCC Home Warranty Insurance premium

03

Excavation and spoil removal, with a written rock allowance

04

Steel, plumbing, sprayed concrete shell and curing

05

Coping, waterline tile and a pebble or tiled interior to a stated allowance

06

Pump, filter, sanitiser, LED lighting and app control

07

Frameless glass pool fence allowance, safety certificate and pool registration

08

Handover, first water balance and a return visit after twelve months

Usually priced separately

Landscaping and decking beyond the coping, pool heating, retaining walls that hold up more than the pool, crane hire where no machine can reach, and rock excavation beyond the allowance. We price each of these as a line item at concept stage, so none of them arrives later as a variation.

A fixed price is only fixed
if the allowances are honest.

Tom Hollis · Founding director

04 · Cost drivers

Five things that move the price

Across forty builds, five factors explain almost all of the difference between a pool at the bottom of its range and one at the top. In order of how often they matter:

01

Site access

Our excavators need a clear path about 1.8 metres wide. Where a side passage is narrower, we use smaller machines and more truck movements, which adds days. Where there is no path at all, a crane lifts the machine, the steel and the spoil bins over the house.

Typical effect · $6K to $25K

02

Soil, rock and water

Sandy coastal sites dig quickly but can need dewatering where the water table is high. Brisbane and hinterland sites often hit rock, which is broken out and priced by the cubic metre. Reactive clay can call for piers under the shell. Test holes before the contract tell us which of these we are dealing with.

Typical effect · $5K to $40K

Fig. 02 · Steel tied and inspected before the shell is sprayed. By this stage the ground is known, which is why we test before we price.

03

Size, depth and shape

Each extra metre of length adds concrete, steel, interior and coping, but no more design, approvals or equipment. Depth costs more than length, because a deeper pool means more excavation and stronger walls. Curves, raised walls and wet edges add formwork and hours.

Typical effect · $4K to $15K per extra metre

04

Coping, interior and tile

This is where taste meets the budget. A sawn bluestone or French limestone coping costs roughly twice a good porcelain paver. A fully tiled glass mosaic interior costs several times a quality pebble finish. Both last for decades, so we suggest choosing once and choosing carefully.

Typical effect · $8K to $45K

05

Approvals and engineering

A flat suburban block needs a standard engineered design and a certifier. A sloping block, a pool near a boundary, a sewer line or a house footing needs site-specific engineering, and coastal or flood overlays can add a council referral. Each adds consultants’ fees and weeks to the programme.

Typical effect · $3K to $20K

Fixed price · Your site

Want a number for your own site?

A director visits, measures the access and books test holes where the ground is uncertain. You get a concept and a fixed price before anything is dug.

Book a site visit

05 · Running costs

Running costs after handover

The build is the large number, but a pool also costs money every year. These are typical annual figures for a 9 metre concrete pool in South East Queensland with a variable-speed pump and a salt or mineral sanitiser.

Item

Typical cost per year

Filtration and pump power

$350 to $600

Salt, minerals and balancing chemicals

$300 to $500

Heat pump, heating May to September

$900 to $1,800

Water top-up

$100 to $250

Professional servicing, optional

$600 to $1,200

A pool blanket is the cheapest saving we know of. It cuts evaporation, holds heat overnight and can halve the bill on a heated pool. Over the longer term, plan to replace the pump and sanitiser at around ten years and to resurface a pebble interior at fifteen to twenty.

06 · Fixed price

How to get a fixed price

A useful price needs a site visit. Anything quoted from an aerial photo is a guess with a number on it. Our process gets you to a fixed price in about six weeks, before you commit to the build.

01

Consult and survey

Weeks 1 to 2

A director walks the site, checks access, levels and services, and books test holes where the ground is uncertain.

02

Design and 3D

Weeks 2 to 6

We design the pool with your architect or landscape designer and price it as we draw, so the concept and the budget arrive together.

03

Fixed-price contract

Week 6

Allowances, rock rates and exclusions are written in. Under Queensland law, the deposit on a domestic building contract of $20,000 or more is capped at 5 per cent.

04

Approvals and engineering

Weeks 6 to 10

Engineering is finalised and the approval lodged. Excavation starts once the approval is issued.

If you are comparing builders, ask each one for the same three things: the allowances in writing, the rate for rock, and what happens if the ground is not what the test holes showed. The answers will tell you more than the headline price.

Sources

01 · Retreat Pools project ledger: 40 completed pools, 2023 to 2026

02 · QBCC: What work requires home warranty insurance · qbcc.qld.gov.au

03 · QBCC: Domestic building contracts, deposits and progress payments · qbcc.qld.gov.au

04 · Queensland Development Code MP 3.4 and AS 1926.1: swimming pool barriers

05 · Queensland Government: Pool safety certificates and the pool safety register · qld.gov.au

Published Sep 18, 2026 · Next review Sep 2027

N°01 · Questions on cost

Questions on cost.

Straight answers to what clients ask once they have seen a number. For anything else, call the studio on 07 5550 3480.

All questions

Does the price include the pool fence?

Yes. Every fixed price includes a frameless glass pool fence allowance, the certifier’s inspection and the pool safety certificate. Upgrades such as taller panels, custom gates or a fence that doubles as a balustrade are priced as options.

Can a concrete pool be built for under $95,000?

Yes, as a plunge pool. Our plunge pools start from $65,000 and suit courtyards and smaller blocks. A full-size family pool for less than $95,000 usually means compromises on coping, interior or equipment that we would rather not make.

How much deposit will I pay?

Queensland law caps the deposit on a domestic building contract of $20,000 or more at 5 per cent. The balance is paid in stages as work is completed: excavation, steel, shell, coping and interior, then handover.

Will the price change once you start digging?

Only if we find something no one could see: rock below the test holes, an unmapped service or groundwater. We dig test holes and locate services before the contract, and the rock allowance is written in with a rate per cubic metre.

N°02 · Keep reading

Three related notes

Keep reading.

More on planning a pool you will be glad you built. Each note links to the pool types it covers.

All notes

Next note

Material · Aug 4, 2026

Travertine, limestone or bluestone: coping that ages well

Concept site by Vectorr Back to vectorr.com.au
Built in Breakdance